<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[J.P. Sicard Construction]]></title><description><![CDATA[Heavy civil construction services across Vermont & NH  - roads, bridges, utilities. Experienced crews, reliable delivery, and a commitment to quality.]]></description><link>https://www.jpsicard.com/blog</link><generator>RSS for Node</generator><lastBuildDate>Wed, 17 Jun 2026 08:50:54 GMT</lastBuildDate><atom:link href="https://www.jpsicard.com/blog-feed.xml" rel="self" type="application/rss+xml"/><item><title><![CDATA[Marshfield – Onion River Road Bridge Replacement]]></title><description><![CDATA[This project is a full replacement of the bridge that was damaged during the July 2023 flooding. The drone footage captures the installation of the new precast concrete beams that will support the bridge deck. Each beam weighed approximately 110,000 pounds and required two of the largest cranes operating in Vermont working in tandem to safely lift and place them.   The new bridge features a 95-foot clear span over the Winooski River and utilizes precast concrete girders to accelerate...]]></description><link>https://www.jpsicard.com/post/marshfield-onion-river-road-bridge-replacement</link><guid isPermaLink="false">6a3027924eb83abb35285006</guid><pubDate>Mon, 15 Jun 2026 16:27:44 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/f42f96_3ed6e918f2a64878b0c0437668fba162~mv2.jpg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Chris Johansen</dc:creator></item><item><title><![CDATA[Danville RELV 2405 – LVRT Culvert Replacement]]></title><description><![CDATA[This project consists of replacing a washed-out culvert on the Lamoille Valley Rail Trail (LVRT) with a new precast concrete box culvert, precast wingwalls, reconstructed stream channel, and rebuilt trail embankment. The work restores a critical trail crossing over Brown Brook while improving the structure's capacity and resilience to future flooding events.   Once complete, the culvert will be waterproofed, backfilled, and the trail restored for public use. Concrete was supplied by SD...]]></description><link>https://www.jpsicard.com/post/danville-relv-2405-lvrt-culvert-replacement</link><guid isPermaLink="false">6a3025bdc0b3ed92b0fae30d</guid><pubDate>Mon, 15 Jun 2026 16:20:59 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/f42f96_798f0f7338c842029cf7c69db329723e~mv2.jpg/v1/fit/w_640,h_480,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Chris Johansen</dc:creator></item></channel></rss>